Download Ruffle3D
Download the package for your computer, unzip it and start the launcher. There's no installer, no account and you don't need administrator rights.
Ruffle3D 0.1.0
Released 2026-10-15 · Release notes
Windows Your system
Installer · Windows 10 and 11 · 91.6 MB
Download for WindowsSHA-256 e4181f7a52c4473b72a4fc42357f4a45da9b5aae013b9b356b86eeaeb650f1a9
Prefer not to install? Portable package (8.1 MB, runs in your browser).
macOS Your system
Portable package · macOS 12 or newer, Intel and Apple silicon · 8.1 MB
Download portable packageSHA-256 a7eae0c6768d9f77c2c56d5d385732c3aeaaf3aeaa3ac4f1cdff2e5b1ac330ae
Linux Your system
Portable package · x64 and ARM64 · 8.1 MB
Download portable packageSHA-256 8e6b8f77ffc2d3a2f5888992c8ee608fb92b0cc3daee8d24fe95eae30036b3bb
Installing on several kinds of computer? Download the all-platforms package (8.1 MB, SHA-256 88a6588827451c93da0eb38740a04e153daffcd1378d8c43941a527f8df59952).
Ruffle3D is free and open source under the GNU GPL v3, for any use including commercial work. Prefer to build it yourself? The source code is on GitHub.
Install
Windows Your system
- Download Ruffle3D Setup and open it.
- Choose where to install, then Install. You get a Start menu entry and a desktop shortcut.
- Ruffle3D starts when setup finishes. Uninstall any time from Settings ▸ Apps.
If Windows SmartScreen appears, choose More info and then Run anyway. This version is not yet code-signed.
macOS Your system
- Download the .zip. Safari unzips it automatically.
- Right-click
Start Ruffle3D (macOS).commandand choose Open. You only need to do this the first time. - Ruffle3D opens in your default browser. Needs Node.js or Python 3.
If macOS says it can't check the app, right-click it and choose Open the first time.
Linux Your system
- Download and unzip the package.
- Run
./start-ruffle3d.shfrom the folder. - Ruffle3D opens in your default browser. Needs Python 3 or Node.js.
Or install from your browser
In Chrome or Edge, open Ruffle3D and choose Install Ruffle3D from the address bar or the app's Project menu. You get a desktop window and an app icon. After the first launch it keeps working without an internet connection.

System requirements
| Operating system | Windows 10 or 11 · macOS 12 Monterey or newer · Linux (x64 or ARM64) with a desktop environment |
|---|---|
| Browser engine | Built into the desktop app. The portable packages and the web version use Chrome or Edge 110+, Firefox 115+, or Safari 16.4+. |
| Graphics | WebGL 2 capable GPU; integrated graphics are fine for most parts |
| Memory | 4 GB minimum, 8 GB recommended for large assemblies |
| Disk space | About 250 MB for the desktop app (30 MB for the portable package), plus your projects |
| Input | A mouse with a scroll wheel is recommended; trackpads work |
| Portable packages (macOS and Linux) | Node.js 18+ or Python 3.8+ |
Verify the download
Compare the SHA-256 checksum above with the one your system calculates:
| Windows | Get-FileHash .\Ruffle3D-Setup-0.1.0.exe -Algorithm SHA256 |
|---|---|
| macOS | shasum -a 256 Ruffle3D-0.1.0-mac.zip |
| Linux | sha256sum Ruffle3D-0.1.0-linux.zip |